New chemical storage tank installed with ladder, piping and diaphragm pump – Northern Ohio chemical plant

Chemical Storage Tank Installation – Northern Ohio

Tank outlet with welded flanged nozzle, 3 inch ball valve and fabricated pipe support bracket

We installed a new chemical storage tank at a chemical plant in Northern Ohio and ran the new lines to put it into service, tying it into the plant’s existing process equipment.

Our scope included:

• Setting the new storage tank in its containment area.
• Welding a flanged outlet nozzle and installing a 3″ ball valve on the tank outlet.
• Fabricating and installing a steel support bracket for the outlet piping.
• Running carbon steel piping from the tank to the air-operated diaphragm transfer pump.
• Running a new overhead fill line along the ceiling on hangers, down to the top of the tank.
• Tying the new lines into the plant’s existing process equipment.

New overhead fill line run on hangers down to the top of a chemical storage tank

Tie-ins to existing equipment

The new lines tie into the plant’s existing process equipment. Tie-ins in a running chemical plant take careful planning around production and safety, and our crews handled them as part of the same job.

Tie-ins to existing process equipment at a chemical plant in Northern Ohio

See more of our carbon steel and utility piping and equipment installation work.

We’re here to help

Submit your request

For Inquiries, Give us a Call or Drop us an Email


    Our recent successful projects.

    latest projects

    New chemical storage tank installed with ladder, piping and diaphragm pump – Northern Ohio chemical plant

    Chemical Storage Tank Installation – Northern Ohio

    New chemical storage tank set, piped and tied into existing process equipment at a chemical plant in Northern Ohio.

    Read more
    Stainless valve matrix skid with mix-proof valves

    Process Skids, Valve Matrices & UV Systems

    Shop-built process skids, valve matrices and UV treatment systems, installed and piped into food and beverage plants.

    Read more
    Stainless tank staircase and sanitary process piping at a beverage plant in Columbus, Ohio

    Tank Staircases & Process Piping in Columbus, Ohio

    Six stainless steel tank staircases plus sanitary process piping for a national beverage manufacturer in Columbus, Ohio.

    Read more
    Pinnacle Metal Works crew setting a Mueller chiller by crane in Nashville, Tennessee

    Chiller Installation in Nashville, Tennessee

    We installed a new Mueller chiller for a food processing plant in Nashville, Tennessee — crane set, sanitary stainless piping and tie-in to the production line.

    Read more
    Sanitary stainless process piping installed at a cheese plant in Minnesota

    Cheese Factory in Minnesota

    We recently had the privilege of completing a pipe processing and installation project at a cheese factory in Minnesota.

    Read more
    Call for a free consultation
    (216) 663-0719
    request a quote